Projects

In application

Cooling Solutions Seen On Site

One Of The Biggest Datacenter In Europe With 72 Unit TECS Radiators
One Of The Biggest Datacenter In Europe With 72 Unit TECS RadiatorsTECS radiators mounted on the roof of the building.
HFO Power Plant With TECS Radiators
HFO Power Plant With TECS RadiatorsRemote radiators on an elevated steel structure of a multi-engine heavy fuel oil power station: 24 units delivered, 72 more in production for the same site.
Radiators For The Customer In Japan
Radiators For The Customer In JapanFirst project for a Japanese customer: a bank of V-type radiators assembled and tested before dispatch.
When You Need, We Offer The Complete Solution
When You Need, We Offer The Complete SolutionRadiators on an elevated steel platform with access walkways, pipework and system connections - designed, built and delivered by TECS as one package.
Cooling Solution With Well-Known Engine Manufacturers
Cooling Solution With Well-Known Engine ManufacturersRemote radiators on a steel support structure beside the generator hall, positioned for free air intake and discharge.
Industrial Power Station
Industrial Power StationRadiator bank serving the generator sets of an industrial plant.
Container-Mounted V-Type Radiators
Container-Mounted V-Type RadiatorsV-type radiators mounted on top of a containerised generator package.
Series Production Of Remote Radiators
Series Production Of Remote RadiatorsIdentical vertical units for a multi-engine project, built and tested in series.
Horizontal Remote Radiators Before Shipment
Horizontal Remote Radiators Before ShipmentHorizontal remote radiators with their fans fitted, tested and ready for shipment at the TECS factory.

Contact Us

Send us the heat duty, the fluid temperatures and flow rates, the ambient conditions and the installation limits. We answer with a design proposal - or write to us on .

TECS Engineering factory, Menemen, İzmir