About Us

TECS Engineering

Heat Exchangers For Power And Industry

TECS Engineering, one of the Karcıoğlu Group companies, manufactures LT/HT radiators for gas and diesel engine generator sets, cogeneration systems and power plants, together with heating and cooling coils for gas turbine air inlets.

Our project-based approach treats each enquiry as a new product. The customer's expectations, the system requirements, the ambient conditions and the site obligations are reviewed in detail, and the design that gives the client the best technical and commercial result is offered. Products are designed from 1 m up to 13 m in length; fan quantity and diameter follow the duty.

TECS units are built with Eurovent-certified coils.

Our product portfolio includes:

  • Horizontal radiators, single circuit and LT/HT
  • Vertical remote radiators with electric fans
  • V-type radiators
  • Mechanical driven radiators for generator sets
  • Gas turbine inlet air heating and cooling coils
  • Oil coolers and fuel coolers
  • Plate and shell-and-tube heat exchangers
  • Expansion tanks in SS304L / SS316L
  • Control panels, junction boxes and heating modules

Who we are

Karcıoğlu Group

Karcıoğlu Group is a diversified industrial group with decades of experience across engineering, manufacturing, construction and industrial solutions. With an annual turnover exceeding EUR 70 million and a workforce of more than 750 employees, the Group has built a strong industrial presence across multiple sectors. Through its companies TECS, AXON, TERMOKAR, KARMAK and KAR CONSTRUCTION, Karcıoğlu Group delivers reliable solutions to customers across a wide range of industries worldwide.

Operating in power generation, heat transfer technologies, industrial manufacturing, construction and turnkey engineering, the Group combines the expertise of its companies to provide integrated, high-quality solutions for complex industrial requirements, managing the project lifecycle from design and manufacturing to installation, commissioning and after-sales support.

Group Companies

TECS Engineering AXON Technic Termokar Heat Exchangers Karmak Kar İnşaat
AXON Technic

AXON Technic

Auxiliary equipment for power generators and integrated containerised power solutions: fuel storage and treatment, exhaust and emissions control, air inlet and outlet systems, electrical distribution and control. TECS cooling equipment is integrated into AXON packages where the project asks for one supplier.

Maltepe Free Zone, Sedir Sk. No: 4, Menemen, İzmir

Visit website
Termokar factory

Termokar Heat Exchangers

Preferred supplier of finned-tube heat exchangers in many geographies from the Middle East to Scandinavia and from Europe to Africa. Termokar produces in a 17,500 m² factory in the Manisa Organised Industrial Zone.

M.O.S.B. 4. Kısım Dilaver Vardarer Cad. No: 4, Manisa

Visit website
Karmak factory

Karmak Plastic Mouldings

Plastic injection moulding for the white goods, automotive and electronics industries since 1990, in three factories of about 54,000 m² in the Manisa Organised Industrial Zone.

Manisa OSB 4. Kısım Mengü Pekcan Cad. No: 3, Yunusemre, Manisa

Visit website
Kar İnşaat

Kar Construction

Established in 1950 and one of the longest-standing construction companies of İzmir, active in construction, contracting, industry, hotel management and the arts.

Alsancak, Cumhuriyet Blv. No: 298, Konak, İzmir

Visit website

Manufacturing

Coils, Headers, Casings And Frames Under One Roof

The finned-tube coil is the heart of every TECS unit and it is made in our own factory. PLC-controlled fin lines stamp the aluminium fins from coil stock, hairpin benders form the copper tubes, and automatic tube expanders fix the tubes into the fins to give the metal-to-metal contact the thermal design relies on. Headers and tube ends are machined on CNC equipment, so every coil of a series is the same coil.

Casings, fan plates, support legs and frames are cut and formed on turret punch presses, brake presses and a shear press, and pipework is bent on CNC pipe benders. Fans, guards, expansion tanks, junction boxes and connections are assembled on the finished unit, and every circuit is pressure tested before the fans are fitted.

Overhead cranes and the assembly area allow units up to 13 m long to be built, tested and packed as one piece for road or sea transport.

Quality

Every circuit is pressure tested, fans and electrical equipment are function tested, and the records are delivered with the unit. Performance and acoustic verification are carried out where the project specifies them.

Our mission

To give every engine and every process the cooling it was designed for, on the site where it runs, at the lowest lifetime cost.

Our vision

To be the heat exchanger partner that power generation OEMs and plant builders call first when the conditions are difficult.

Contact Us

Send us the heat duty, the fluid temperatures and flow rates, the ambient conditions and the installation limits. We answer with a design proposal - or write to us on .

I am interested in
TECS
AXON Technic
One enquiry reaches both companies of the group.
Send us files

TECS Engineering factory, Menemen, İzmir