Remote Radiators For Generator Sets
Remote radiators for diesel and gas generator sets: single circuit or LT/HT, horizontal, vertical and V-type, designed for the site ambient by TECS.
ReadRadiators by application
What a remote radiator does for a generator set, a power plant, a CHP unit or a data center, and what to send with an enquiry.
Remote radiators for diesel and gas generator sets: single circuit or LT/HT, horizontal, vertical and V-type, designed for the site ambient by TECS.
ReadLT/HT radiators for gas and diesel engine power plants: cooler banks for multi-engine stations, designed against recirculation, heat and dust by TECS.
ReadEmergency coolers (dump radiators) for gas engine CHP plants: they keep the engine running when the heat consumer cannot take the heat. Made by TECS.
ReadRadiators for data center backup generators and liquid cooling: V-type and remote radiators for roofs and yards, low sound, designed by TECS.
ReadTECS Engineering: industrial radiators for generator sets, power plants, CHP and data centers worldwide. Each radiator designed for its project.
ReadKnowledge base
Plain answers to the questions buyers ask: what a dry cooler is, which heat exchanger does what, how a radiator works, what glycol and maintenance do to it and how to read a datasheet - written by the engineers who design them.
The air-cooled heat exchanger explained: coil, fans, hot and high sites, and what it is called in each trade.
ReadThree ways to get rid of heat compared: water, noise, footprint and cost.
ReadAir-cooled, plate and shell-and-tube: what each does well, where it fits and how they work together.
ReadTubes, fins and coatings - what a coil is, what it does in a radiator and why the site matters.
ReadJacket water, charge air, LT/HT, engine-mounted or remote - how the cooling system of a generator set fits together.
ReadFrost protection, heat capacity and pressure drop - what the glycol mixture changes in a radiator.
ReadFouling, fans, coolant, corrosion: the checks and the cleaning that keep a radiator or dry cooler at its capacity.
ReadCapacity, conditions, pressure drops, sound levels, dimensions: what the sections of a datasheet tell you and how to compare two offers.
ReadThe inputs that decide a radiator, where to find them on the engine data sheet, and what to send for a proposal.
ReadTwo fan families, one coil: what EC fans change in control, power, noise and price - and where AC fans still win.
ReadFoundation, pipework, expansion tank, venting, filling, commissioning: the installation of a remote radiator step by step.
ReadWhere the heat comes from in an engine, which circuit carries it and how the radiator closes the loop.
ReadTwo coils in a V under one fan row: what the arrangement gains, what it costs and where it is the right choice.
ReadWhat a capacity figure means, which conditions it belongs to and why two offers must be compared on the same ones.
ReadA hot day costs a gas turbine a large share of its output - how inlet coils win it back, and what they must withstand.
ReadJacket water, oil, charge air and exhaust - how a CHP plant turns engine heat into useful heat, and where the radiator fits.
ReadWhy turbocharged engines cool their intake air, the two ways to do it, and why the LT circuit is the hardest duty on a hot site.
ReadCopper-aluminium, all-aluminium or copper-copper: what each coil construction gives in heat transfer, corrosion and cost.
ReadJacket water and charge air need different temperatures - how one radiator serves both circuits, and why the cooler one is the demanding one.
ReadA fan on the engine's own drive and a radiator in front of it: what makes this the simplest cooling system, and where it stops being the right one.
ReadThe radiator leaves the generator set and stands on its own with electric fans - what that changes, and when it is the better layout.
ReadSame coil, same engine, different direction of the air - why the site plan, not the engine, usually decides between a horizontal and a vertical radiator.
ReadFans make the noise, the site decides how much of it matters - where radiator sound comes from and how projects keep it within the limit.
ReadHot air and thin air both weaken a radiator - what changes on desert and mountain sites and how the design answers it.
ReadA gas engine plant needs a radiator that serves several circuits, follows the load and works with heat recovery - what it does and what to tell the maker.
ReadWhy data centers choose dry coolers, what free cooling means in plain words and what to tell the maker.
ReadWhat adiabatic pre-cooling adds to a dry cooler, when it pays off and when a plain unit is the better choice.
ReadA dry cooler only performs as well as the air it gets - how the position on the roof or the ground decides that, and what to settle before the layout is fixed.
ReadThe yearly rhythm of a dry cooler: a clean coil before the heat, an eye on fans and liquid, and a plan for frost and snow before the first cold night.
ReadFour names, one job and a few real differences - how to read the words on an engine data sheet and what to write in an enquiry.
ReadLong summers, sand in the air, sun and salt on the coast - what a Middle East site asks of a dry cooler or radiator, and what belongs in the enquiry.
ReadRepair, new core or new unit - how to judge an old engine radiator, what must fit the existing site and what a maker needs to know before quoting a replacement.
ReadA rental set goes to a new site every few months - why its radiator has to cover any climate, survive the road and be easy to clean and repair.
ReadOne engine, more than one fuel - why the radiator of a dual-fuel or hydrogen-ready engine is planned for every mode the engine may run in, today and after a later conversion.
ReadFarm air, landfill dust and a heat demand that changes with the seasons - what a biogas or landfill gas site asks of the engine radiator.
ReadA stack of corrugated plates between two liquids: why the plate exchanger is compact, efficient and so common.
ReadGaskets, brazing or welding between the plates: what each kind gives, what it costs and when to pick it.
ReadCompact plates or robust tubes: what each exchanger is good at and how to tell which one a duty needs.
ReadThe exchanger between the engine circuit and the rest of the plant: what it protects, what it recovers and how it is arranged.
ReadPlate exchanger inside, radiator outside, glycol between them: the common arrangement and the reasons for it.
ReadWhy plate exchangers lose performance, how they are cleaned and what keeps them clean.
ReadStainless steel, titanium or something else, and which gasket: how the fluids and the site decide.
ReadThe facts a good enquiry carries and the decisions that follow from them.
ReadWhy data centers put a plate heat exchanger between the server loop and the outside world.
ReadWhat the plate heat exchanger does when an engine or CHP plant sells or reuses its heat.
ReadThe exchanger in every heating substation: why the network and the building are kept apart, and how tap water is heated.
ReadThe exchanger that splits a chilled water system into two circuits: why it is there and what it is asked to do.
ReadWhat a plate heat exchanger does in industrial process cooling and why the process and the cooling water are kept apart.
ReadThe common problems of plate heat exchangers, how to recognise a leak early and what is done about it.
ReadGlycol circuits with plate heat exchangers: why they are used, what changes and how the circuit is looked after.
ReadWhat pressure drop and approach temperature mean when buying a plate heat exchanger, and why they pull against each other.
ReadWhen an old plate heat exchanger is repaired, extended or replaced, and what to tell the supplier about it.
ReadThe questions a buyer should put to a plate heat exchanger supplier, and what a good answer looks like.
ReadSea water on one side, the engine circuit on the other: why marine and offshore plants put a plate heat exchanger between them.
ReadRadiators by engine
Radiators for the engines our customers run, from single generator sets to large engine power plants.
LT/HT, V-type and remote radiators for Jenbacher gas engines in power plants, CHP and data centers.
ReadRemote and V-type radiators for MTU generator sets in data centers, hospitals and power plants.
ReadRemote, V-type and mechanical driven radiators for Cummins generator sets.
ReadRemote, V-type and LT/HT radiators for Caterpillar diesel generator sets and gas engines.
ReadLT/HT, V-type and remote radiators for MWM gas engines in CHP plants and power plants.
ReadV-type and LT/HT radiator fields for Wärtsilä engine power plants.
ReadSend us the heat duty, the fluid temperatures and flow rates, the ambient conditions and the installation limits. We answer with a design proposal - or write to us on WhatsApp.
