In short
TECS Engineering designs and manufactures radiators for MWM gas engines in CHP plants, greenhouses and power plants: LT/HT radiators for the two cooling circuits of the engine and emergency coolers that take the heat when it is not used. Each radiator is designed for its engine and its site.
MWM gas engines are widely used for combined heat and power: in district heating, greenhouses, hospitals, industry and biogas plants. Most of their heat is used, but the engine still needs radiators for the charge air and for the hours when the heat is not needed.
TECS Engineering designs those radiators for the engine and the plant.
The Charge Air Circuit
The low-temperature charge air circuit of a gas engine usually goes to a radiator, because its heat is too cool to be useful. This radiator works whenever the engine runs.
The Emergency Cooler
When the heating network does not need all the heat, an emergency cooler takes the rest so the engine can keep producing power.
One Unit For Both
An LT/HT radiator brings both duties into one unit with one set of fans, which saves space on a busy CHP site.
Quiet Units For Towns And Greenhouses
CHP plants are often close to homes. Fans that slow down when they can keep the sound level low, and the sound limit is part of the design from the start.
What TECS Engineering Delivers
- Radiator designed for the engine and the site
- Manufacturing in our own factory
- Factory testing before shipment
- Complete documentation with every unit
- Support from enquiry to start-up
What To Send With An Enquiry
- The engine type and how many engines the site has
- The engine maker's cooling data sheet, if you have it
- Where the radiators will stand and the conditions of the site
- The sound limit and where it is measured
- The power supply for the fans and any space limit
Questions We Are Often Asked
Do you make radiators for MWM TCG engines?
Yes. Each radiator is designed for the engine it cools and for the plant.
Can one radiator do the charge air and the emergency cooling?
Yes. An LT/HT radiator carries both circuits in one unit.
Is TECS Engineering part of MWM?
No. TECS Engineering is an independent radiator manufacturer. MWM is a trademark of its owner and is used here only to name the engines our radiators cool.
What do you need for a quotation?
The engine type, the engine maker's cooling data, where the radiator will stand, the site conditions and the sound limit. With that we prepare the proposal.
Contact Us
Send us the heat duty, the fluid temperatures and flow rates, the ambient conditions and the installation limits. We answer with a design proposal - or write to us on WhatsApp.