Radiators For Biogas And Landfill Gas Engines: What The Site Asks For

Knowledge base

In short

A biogas or landfill gas engine runs around the clock on a fuel made from waste, usually on a rural or unmanned site. Its radiator has to cope with air that attacks metal and clogs fins, take the full engine heat whenever the digester or heat user does not need it, and often move with the engine when the gas supply runs down. It is chosen for the site air and the way the plant uses its heat, not only for the engine data.

Stand next to a biogas plant on a farm or at the gas field of a closed landfill and the first thing you notice is the smell. That smell is the part of the site the radiator lives with every day. The engines are often the same gas engines that run on pipeline gas elsewhere, but the place they stand in is very different: dirty air, few people on site, a plant that earns money for every hour it runs, and in the case of landfill a gas supply that slowly falls away over the years. This guide explains what that means for the radiator, in plain words.

The Air Around A Digester Or A Landfill

Biogas and landfill gas carry sulphur compounds and other impurities, and some of them escape near the digesters, the gas cleaning, the flare and the engine exhaust. Farms add ammonia from manure and silage. On a landfill the wind brings dust, fine plastic film and paper, and at harvest time a biogas site has chaff, seeds and pollen in the air. All of it passes through the radiator, because the fans pull in whatever the site breathes.

Two things follow. The metal of the coil and the casing is attacked faster than on a clean site, so the coating and the materials are chosen for that air from the start; a standard finish that is fine at a power station can be the weak point here. And the fins collect dirt, so the coil needs to be one that can be reached and washed without much effort, because on an unmanned site the cleaning happens when someone has time, not on a neat schedule.

Heat The Plant Keeps For Itself

A biogas plant needs warmth to keep its digesters working, and the engine jacket heat is the usual source. In winter the digesters and perhaps a nearby house, barn or dryer take a large part of that heat. In summer they take much less, and on a warm night almost none. The radiator takes whatever is left, so its share of the work swings with the seasons and the hour.

The design case is the day the heat user takes nothing: a hot afternoon, the digesters warm, the dryer stopped. On that day the radiator has to carry the whole engine heat on its own, and the charge air circuit still needs its cool water. A landfill site usually has no heat user at all, and there the radiator carries nearly everything all year. Speed-controlled fans let the radiator follow these swings instead of running flat out when little cooling is needed.

A Plant That Should Never Stop

These plants are paid for the electricity they deliver, and the gas does not wait: a digester keeps producing and a landfill keeps releasing gas whether the engine runs or not. An engine that trips on high coolant temperature means lost income and gas going to the flare. So reserve for the hottest days, several fans sharing the work so one failure does not stop the engine, and an alarm that reaches whoever is responsible are worth more here than on a plant with a control room full of people.

Gas quality also changes from day to day, and the engine output follows it. Long hours at part load are normal, which is another reason to let the fans slow down with the load.

When The Gas Runs Down

A landfill produces most of its gas in its early years and then less and less. Operators add engines while the gas rises and later move them to a younger site, or swap a large engine for a smaller one. Many landfill and farm engines are therefore built into containers, with the radiator on the roof or beside the container on its own frame. A radiator that can be lifted, transported and connected again at the next site keeps its value; one built into the site for good is left behind.

TECS Engineering designs and builds radiators and LT/HT radiators for biogas, landfill gas and other gas engines, for containerized and open installations. Send the engine data, the heat the plant uses for itself and a few words about the air on site, and TECS does the calculation.

In Short

  • Biogas and landfill air attacks metal and clogs fins, so coating and coil are chosen for it
  • Easy access for cleaning matters on unmanned sites
  • The digester takes engine heat in winter, much less in summer
  • The design case is the day the heat user takes nothing
  • Landfill sites usually send nearly all engine heat to the radiator
  • Containerized radiators can move with the engine when the gas runs down
See the products

What To Send With An Enquiry

  • Engine make and model, or the engine data sheet with every cooling circuit
  • Whether the plant uses engine heat for the digester or other users, and how much in summer
  • The kind of site: farm biogas, food waste, sewage or landfill
  • Site ambient on the hottest day, altitude and what is in the air
  • Container roof, separate frame or ground installation, and whether the unit will be moved later
  • Fan power supply, sound limit and how alarms reach the operator
Send an enquiry Send us files

Questions We Are Often Asked

Is a biogas engine radiator different from a natural gas engine radiator?

The cooling duty is often similar, but the site is not. The air on a biogas or landfill site attacks metal and clogs fins, so the coating, the coil and the access for cleaning are chosen for it.

Why does the radiator have to take the full engine heat if the digester uses some of it?

Because there are days when the digester and the other heat users take almost nothing, such as a hot summer afternoon. The engine must still run at full load on those days, so the radiator is designed for that case.

Does a landfill gas engine need a bigger radiator?

Often it carries more of the engine heat than a biogas plant radiator, because a landfill site usually has no heat user. The engine data and the site decide the size.

Can the radiator move with the engine to another landfill?

Yes, if it is built for it. A radiator on a container roof or on its own transportable frame can be lifted, carried and connected again at the next site.

How often should the radiator on a biogas site be cleaned?

It depends on the season and the site. Harvest time, dry windy weather and landfill dust load the fins faster, so the coil should be checked regularly and washed when dirt builds up.

Contact Us

Send us the heat duty, the fluid temperatures and flow rates, the ambient conditions and the installation limits. We answer with a design proposal - or write to us on .