Radiators by engine
In short
TECS Engineering designs and manufactures V-type and LT/HT radiators for Wärtsilä engine power plants. A plant of several large engines needs a field of radiators that cools both circuits of every engine on a limited plot, in the climate of the site.
Wärtsilä engine power plants supply grids, industry, mines and islands, often in hot, dusty or coastal places. Every engine in the plant needs its cooling, and together the radiators form one of the largest parts of the site.
TECS Engineering designs and builds the radiator field for the plant and its climate.
A Radiator Field On A Limited Plot
V-type radiators put the most cooling on the least ground. The field is laid out so that the units do not take each other's warm air.
Both Circuits Of Every Engine
Each engine has a high-temperature and a low-temperature circuit. LT/HT radiators cool both, engine by engine, so each engine can run on its own.
Hot, Dusty And Coastal Sites
The design takes the climate of the site into account from the start, so the plant keeps its output on the hottest days and the radiators keep their life.
From Design To Start-Up
TECS Engineering designs, builds and tests the radiators and supports the project until the plant runs.
What TECS Engineering Delivers
- Radiator designed for the engine and the site
- Manufacturing in our own factory
- Factory testing before shipment
- Complete documentation with every unit
- Support from enquiry to start-up
What To Send With An Enquiry
- The engine type and how many engines the site has
- The engine maker's cooling data sheet, if you have it
- Where the radiators will stand and the conditions of the site
- The sound limit and where it is measured
- The power supply for the fans and any space limit
Questions We Are Often Asked
Do you make radiators for Wärtsilä 34SG and 50SG engines?
Yes. Each radiator is designed for the engine it cools and for the plant.
Can you supply the radiators for a whole plant?
Yes. The radiator field is designed for all the engines of the plant and the layout of the site.
Is TECS Engineering part of Wärtsilä?
No. TECS Engineering is an independent radiator manufacturer. Wärtsilä is a trademark of Wärtsilä Corporation and is used here only to name the engines our radiators cool.
What do you need for a quotation?
The engine type, the engine maker's cooling data, where the radiator will stand, the site conditions and the sound limit. With that we prepare the proposal.
Contact Us
Send us the heat duty, the fluid temperatures and flow rates, the ambient conditions and the installation limits. We answer with a design proposal - or write to us on WhatsApp.
