V-Type Radiators

V-type radiators

A V-type radiator combines two inclined coils under a common row of top-mounted fans. The arrangement carries large capacities on a short footprint and suits power plants, data centers and chiller free cooling where many units stand side by side.

TECS designs every V-type unit for its own duty, ambient and sound limit, as a single-circuit unit or with the LT and HT circuits of an engine in one frame.

Request a design Send us files

More Cooling On Less Ground

Two coils set in a V under a common fan deck give close to twice the coil surface of a flat unit on the same plot. Where a plant needs many units in a row, this keeps the cooling yard short and the pipe runs compact.

Designed As A Bank, Not Only As A Unit

Units that stand side by side influence each other: warm air leaving one unit can return to the inlet of the next. The layout, the spacing and the airflow are checked together with the duty, so the bank delivers its capacity on the hottest day of the year.

Fans, Sound And Part Load

EC fans with integrated speed control run slower at part load and at night, which saves power and lowers the sound level. AC fans with external speed control are available where the site specification asks for them.

Built For Fast Installation

A common galvanised or painted steel frame carries both coils, the fan deck, the headers and the junction boxes, with lifting points for the crane. Connections, expansion tank, level switch and control panel are fitted at the factory, so the unit is connected and started on site in a short time.

Typical Scope Of Supply

  • Two inclined coils with headers and flanged connections
  • Common steel frame with fan deck and lifting points
  • EC fans with speed control (or AC fans)
  • Junction boxes or control panel
  • Expansion tank with level switch
  • Factory pressure test and function test
  • Datasheet, dimensional drawing, fan curve, acoustic data, IOM manual

Technical Overview

Arrangement
V-type, top-mounted induced-draught fans
Circuits
Single circuit or LT/HT
Fans
EC / AC axial fans
Capacity
Multi-unit arrangements for MW-class plants
Materials
Cu/Al, AlMg2.5, epoxy coating, galvanised or painted casing
Options
Speed control, expansion tank, control panel, protection guards

Questions We Are Often Asked

When is a V-type radiator better than a horizontal one?

When the plot is small or many units have to stand in a row. For a single unit with enough space, a horizontal radiator is often simpler and lower in cost.

Is a V-type dry cooler the same as a V-type radiator?

The construction is the same. The name usually follows the application: radiator for engine cooling, dry cooler for process, HVAC and data center circuits.

Can a V-type unit carry LT and HT circuits?

Yes. The two circuits are built into one frame with separate headers and connections.

What do you need for a quotation?

The heat to be rejected or the engine model, the coolant and its glycol content, the flow rate or the inlet and outlet temperatures, the design ambient temperature and altitude, the sound limit with its distance, and any space limit. An engine manufacturer's datasheet covers most of it.

Contact Us

Send us the heat duty, the fluid temperatures and flow rates, the ambient conditions and the installation limits. We answer with a design proposal - or write to us on .

I am interested in
TECS
AXON Technic
One enquiry reaches both companies of the group.
Send us files

TECS Engineering factory, Menemen, İzmir