Data Center Cooling

Data centers

In short

TECS Engineering designs and builds data center cooling equipment: dry coolers for the IT cooling loop and free cooling, and radiators for the backup generator sets. The units are delivered to data center projects in Europe, the Middle East and worldwide.

A data center has two cooling jobs outside the building: rejecting the heat of the IT equipment, around the clock, and keeping the backup generator sets cool on the day the grid fails. TECS Engineering designs and builds the units for both, each one for its own project.

Dry coolers serve the IT cooling loop and free cooling. Remote and V-type radiators cool the engines of the backup power plant.

Request a design Send us files

Dry Coolers For The IT Cooling Loop

Dry coolers take the heat of the chillers, the liquid-cooled racks and the free cooling circuit to the outside air without using any water. On cool days they carry the load on their own, which saves the chillers a great deal of energy.

Radiators For The Backup Generators

The generator sets of a data center must start and carry the full load in the worst weather of the year. Their remote and V-type radiators are designed for that day, for the engine they cool and for the place they stand.

Many Units On A Small Plot

Large campuses place many units side by side on roofs and in yards. V-type units put more cooling on the same ground area, and the layout is planned so the units do not take each other's warm air.

Quiet Neighbours

Data centers are often close to homes and offices. Fans that slow down at part load and at night keep both the energy use and the sound level low, and the sound limit of the site is part of the design from the start.

What TECS Engineering Delivers

  • Design for the duty and the site
  • Manufacturing in our own factory
  • Factory testing before shipment
  • Complete documentation with every unit
  • Support from enquiry to start-up

Questions We Are Often Asked

Which cooling units does a data center need outside the building?

Usually dry coolers for the IT cooling loop and radiators for the backup generator sets. TECS Engineering designs and builds both.

Do dry coolers use water?

No. The liquid stays in a closed circuit and the heat goes to the air, so a dry cooler uses no water, which matters more and more for data centers.

Can you supply the radiators for a whole generator plant?

Yes. From a single standby set to a plant of many engines, each radiator is designed for its engine and the site.

What do you need for a quotation?

The engine model or the cooling duty, where the unit will stand, the site conditions, the sound limit and any space limit. An engine manufacturer's datasheet covers most of it, and we prepare the proposal from there.

Contact Us

Send us the heat duty, the fluid temperatures and flow rates, the ambient conditions and the installation limits. We answer with a design proposal - or write to us on .

I am interested in
TECS
AXON Technic
One enquiry reaches both companies of the group.
Send us files

TECS Engineering factory, Menemen, İzmir