In short
Heat rejection is the amount of heat a radiator or dry cooler releases to the air, and the capacity figure on the datasheet states it. The figure is only meaningful together with the conditions it was calculated for, such as the air and coolant. Comparing capacities without those conditions is the most common mistake in the trade.
A radiator or dry cooler is sold by its cooling capacity in kilowatts, and that number is the most misread figure in the trade, because it means nothing without the conditions it was calculated for. This guide explains what heat rejection is, where the heat goes and which conditions must accompany a capacity for it to be comparable.
The Liquid Side: Where The Heat Comes From
The heat a radiator rejects is the heat the liquid gives up: it depends on how much liquid flows, what the liquid is and how much it cools. A glycol mixture carries less heat than water for the same flow and the same temperature change, so the liquid is always part of the statement of a capacity.
The engine data sheet fixes the flow and the heat. The temperatures follow, and the radiator has to deliver them at the stated inlet temperature.
The Air Side: Where The Heat Goes
The same heat arrives in the air, which carries very little heat per cubic metre. That is why radiators are large and why the fans must move a great deal of air. Altitude and the design ambient change the air the fans have to deliver, so both are stated with the capacity.
Across The Coil: Why The Ambient Matters
The coil moves the heat from the liquid to the air through its surface, driven by the temperature difference between the two. The hotter the ambient, the smaller that driving difference becomes and the more surface the same heat needs. A dry cooler can never bring the liquid down to the air temperature, and the closer the liquid is asked to come, the larger the coil.
This is the quickest way to see what a change of ambient does: the same unit rejects noticeably less heat on a hotter day than it was rated for.
Why A Capacity Needs Its Conditions
The same radiator is a larger-capacity unit at one set of conditions and a smaller one at another. A capacity is therefore only complete with the liquid temperatures, the flow, the glycol percentage, the air inlet temperature and the altitude - and, for exact comparisons, the humidity basis. Two offers are compared only after they are brought to the same conditions; a cheaper offer at a lower ambient is an offer for another site. TECS prints every one of these conditions on the datasheet next to the required and the calculated capacity, so that the number can be checked by anyone with the engine data sheet in hand.
In Short
- Capacity is heat rejected in kW, and it belongs to stated conditions
- Water carries more heat than a glycol mixture for the same flow
- Air carries little heat, so radiators are large and need much air
- A hotter ambient means less driving difference and more surface
- A capacity is complete only with its temperatures, flow, glycol, ambient and altitude
- TECS states all of them on the datasheet beside required and calculated capacity
What To Send With An Enquiry
- Heat to be rejected, or the flow and the temperatures that define it
- Liquid: water or the glycol mixture and percentage
- Design air inlet temperature and altitude
- Required liquid outlet temperature
- Pressure drop limit on the liquid side
- Site, sound limit and space, for the design that follows
Questions We Are Often Asked
How do I convert kW to kcal/h or BTU/h?
Engine data sheets from different makers use kW, kcal/h and BTU/h. Send the figures in the unit you have and TECS Engineering converts them; the datasheet is issued in kW.
Why does my radiator reject less than its rated capacity?
Check the conditions: a hotter ambient than designed, a lower coolant inlet, more glycol, a fouled coil or an altitude that was not in the enquiry each take a share. The datasheet says what the capacity was calculated for.
Can the capacity be raised by more flow?
More flow raises the capacity a little and the pressure drop a lot; the engine maker's flow and pressure drop limits bound it. More surface or more air is the usual way.
How close to the ambient can a dry cooler cool the liquid?
Never to the ambient itself, and each step closer makes the unit larger. For engine radiators, where the coolant is hot, this is rarely a limit.
Does humidity count in the capacity?
Humid air is slightly lighter and carries vapour that is heated too; the effect is small but real on a hot, humid site. The datasheet states the basis so that figures can be compared.
Contact Us
Send us the heat duty, the fluid temperatures and flow rates, the ambient conditions and the installation limits. We answer with a design proposal - or write to us on WhatsApp.