Every Type Of Engine Radiator
Remote radiators stand apart from the engine, mechanical driven radiators sit in front of it, and V-type radiators carry large engines on a small plot. TECS Engineering designs and builds all of them.
Engine cooling
An engine radiator keeps a diesel or gas engine at the temperature its maker asks for by giving the engine heat to the air. TECS Engineering designs and builds engine radiators for generator sets, engine power plants, CHP plants and industrial engines.
Every radiator is made for its own engine, its own site and its own installation.
Request a design Send us filesRemote radiators stand apart from the engine, mechanical driven radiators sit in front of it, and V-type radiators carry large engines on a small plot. TECS Engineering designs and builds all of them.
From standby generator sets to large gas engine power plants, each radiator is designed for the engine it cools, with one or both cooling circuits in one unit.
Hot climates, high altitudes, coastal air and dusty sites are part of the design from the start, so the engine stays cool on the worst day of the year.
Where the project needs it, the heating module and the other auxiliaries come with the radiator, so the engine cooling system arrives as one coordinated package.
It takes the heat from the engine coolant and gives it to the air, so the engine runs at the temperature its maker asks for.
That depends on the engine, the site and the installation. Send us the engine model and the site, and we propose the right type.
Yes. TECS Engineering designs radiators to the requirements of the engine manufacturer, whatever the make.
The engine model or the cooling duty, where the unit will stand, the site conditions, the sound limit and any space limit. An engine manufacturer's datasheet covers most of it, and we prepare the proposal from there.
Send us the heat duty, the fluid temperatures and flow rates, the ambient conditions and the installation limits. We answer with a design proposal - or write to us on WhatsApp.
