Self-Contained Cooling
The fan runs with the engine, so the radiator needs no separate power supply or fan controls. The generator set and its cooling form one compact unit.
Engine-driven cooling
A mechanical driven radiator takes its fan power from the engine itself. It is the compact, self-contained cooling solution for generator sets where no electric fan power is wanted and the radiator stands in front of the engine.
TECS Engineering designs and builds mechanical driven radiators for diesel and gas generator sets, each one for its own engine and installation.
Request a design Send us filesThe fan runs with the engine, so the radiator needs no separate power supply or fan controls. The generator set and its cooling form one compact unit.
Every mechanical driven radiator is designed for the engine it cools and for the room or container it stands in, so the engine stays at the temperature its maker asks for.
Mechanical driven radiators suit standby and prime power generator sets, rental fleets and containerized gensets, wherever a simple and robust cooling solution is wanted.
A mechanical driven radiator can cool one engine circuit or both circuits of the engine in one package.
A radiator whose fan is driven by the engine itself instead of an electric motor, mounted in front of the engine on the generator set.
A mechanical driven radiator is compact and needs no fan power. A remote radiator stands away from the engine and suits quieter engine rooms and larger plants. We advise on the right choice for each project.
Yes. Mechanical driven radiators are often used in containerized generator sets.
The engine model or the cooling duty, where the unit will stand, the site conditions, the sound limit and any space limit. An engine manufacturer's datasheet covers most of it, and we prepare the proposal from there.
Send us the heat duty, the fluid temperatures and flow rates, the ambient conditions and the installation limits. We answer with a design proposal - or write to us on WhatsApp.
