Radiator manufacturer
In short
TECS Engineering is an industrial radiator manufacturer in Izmir, Turkey, building radiators that cool engines in generator sets, power plants, CHP plants and data centers. Every radiator is designed for its own project rather than picked from a catalogue, so the unit delivered matches the duty, the site and the sound requirement.
TECS Engineering designs and manufactures industrial radiators in Menemen, İzmir, Turkey. The radiators cool diesel and gas engines in generator sets, power plants and CHP plants, and the IT load and backup power of data centers. TECS is a Karcıoğlu Group company and builds its units with Eurovent-certified coils.
Every radiator is made for its project. There is no catalogue unit that is chosen and shipped: the duty, the coolant, the site ambient, the sound limit and the space decide the design, and the drawing the customer receives is the unit that was designed for the job.
Made To Order, From Small Units To Large Stations
TECS radiators are built in sizes from a single-fan unit to long multi-fan banks, with the fans following the duty. Horizontal, vertical, V-type and mechanical driven radiators, single circuit or LT/HT, cover generator sets from standby units to large stations.
Alongside the radiators TECS supplies gas turbine inlet air heating and cooling coils, oil and fuel coolers, plate and shell-and-tube heat exchangers, expansion tanks and heating modules.
Design, Production And Test In One Place
Coils, headers, casings and frames are produced under one roof. Each unit is designed by TECS Engineering, which also prepares the datasheet and the general arrangement drawing. Every circuit is pressure tested before dispatch, and fans and electrics are function tested.
TECS radiators run in data centers, HFO power plants and engine plants of well-known engine manufacturers, and are delivered worldwide, from European data centers to customers in Japan.
Radiators And Equipment
- Horizontal remote radiators, single circuit and LT/HT
- Vertical remote radiators with electric fans
- V-type radiators
- Mechanical driven radiators for generator sets
- Gas turbine inlet air heating and cooling coils
- Oil and fuel coolers, heat exchangers, expansion tanks and heating modules
What To Send With An Enquiry
- The application: generator set, power plant, CHP, data center or other
- Heat to be rejected, coolant, flow and temperatures
- Site ambient temperature and altitude
- Sound limits, space and transport limits
- Fan supply voltage and frequency
- Required delivery date and destination
Questions We Are Often Asked
Where are TECS radiators made?
In the TECS factory in Menemen, İzmir, Turkey.
Do you sell standard radiators from stock?
No. Every TECS radiator is designed for its project, from the duty, the coolant and the site conditions.
Which documents come with an offer?
A datasheet, a dimensional drawing, the fan curve and the acoustic data of the selected unit.
Do you deliver outside Turkey?
Yes. TECS radiators are delivered worldwide, packed and documented for export.
Contact Us
Send us the heat duty, the fluid temperatures and flow rates, the ambient conditions and the installation limits. We answer with a design proposal - or write to us on WhatsApp.
